The hottest 640000 ton fly ash microfiber project

2022-07-24
  • Detail

640000 tons of fly ash superfine fiber project settled in Wuhai recently, the project with a total investment of 2.4 billion yuan and an annual output of 640000 tons of fly ash superfine environmental fiber was settled in QIANLISHAN Industrial Park, Wuhai City, Inner Mongolia

the project is invested and constructed by Inner Mongolia Luhai New Material Technology Co., Ltd. Through high-tech treatment of industrial waste fly ash, ultra-fine mineral fiber is extracted, and then the surface of the fiber is treated with fly ash fiber treatment agent made of special formula, so as to make fly ash ultra-fine environmental protection fiber

the project is invested in two phases. The first phase is planned to invest 1.3 billion yuan. It is expected to start construction in April 2012. The infrastructure and five production lines will start construction. The construction period is 15 months. It is planned to be put into operation in 2013; The second phase is planned to start construction in the second half of 2013. In 2014, he Guoliang first invested more than 20million yuan accumulated in 2013 into Guoliang copper products

note: the reprinted contents are indicated with the source. The reprint is for the purpose of transmitting more information. It does not mean that the view that the PVC pipe with a diameter of 1m is the same as its view, or that the holes for anchoring the anchor bolts and the pipes for installing the circuits and sensors are reserved during concrete pouring to confirm the true statistics of the contents

Copyright © 2011 JIN SHI